After being taken over by the state, the hydropower plant Gabcikovo had to undergo a change and introduce new control systems. This entire transition under the new systems was secured by the Slovak dispatch centre Slovensky elektroenergeticku dispecing (SED) of the Slovak transmission system operator Slovenska elektrizacna prenosova sustava (SEPS).